Drilling at East side of Dunnet Bay - Notice To Mariners
8th November 2019
Proposed routes of vessels involved in installation (from port to site)
Main Vessel Route: Kirkwall -Scrabster
Scrabster -Dunnet Bay
Scrabster VTS will be notified of all operations and movements
Details of any areas to be avoided
Vessels are requested to maintain a minimum distance of 250 meters from the stated
Co-ordinates submitted. INSTRUCTIONS TO VESSELS
Vessels involved will be keeping continuous listening watch on Channel 16 and 6 and will display appropriate lights and marks as required by the International Rules for Preventing Collisions at Sea.
Mariners are requested to give the works a wide berth.