Caithness Map :: Links to Site Map Great value Unlimited Broadband from an award winning provider WED 9TH JUL 2025    10:18:09 AM BST
This site uses cookies, by continuing to use this site you accept the terms of our privacy policy
Back To Top
Caithness.Org Quick Links
Home
Construction
Leisure
Manufacturing
Misc.
Primary
Professional
Public
Retail
Tourism
Transport
Site Map
 
 
 
 
 
 
 
 
 
 
 
 
 

Feed 2.0 Loading...

Creative thinking helps reactor demolition

4th December 2013

Photograph of Creative thinking helps reactor demolition

Another pioneering in-house invention has allowed the PFR reactor dismantling team to complete one of the final phases of the reactor dismantling ready for final demolition.
The centre guide tube was successfully raised from the reactor core, demonstrating that internal fixtures can be safely removed. This supports the plans for taking apart the remainder of the former electricity generating plant.

The original equipment to remove and replace reactor core components was designed to operate while immersed in molten sodium at temperatures exceeding 350�C . Now the reactor is drained of sodium and the temperature has fallen below 100�C this equipment no longer works.

So the reactor dismantling team set to work and identified an alternative method to remove the reactor core items via existing penetrations, which was a first for the project team.

A DSRL design team led by Calder Bain proposed a long series grab, capable of reaching down approximately ten metres from the reactor top to latch onto the guide tube, with a chain block connected to the building crane which carefully raised the tube from the reactor depths.

Manufacture of the extraction and sampling equipment was undertaken by local contractors and subsequently assembled and trialled at JGC's T3UK Facility.
Once proved successful, the equipment was transferred to PFR where a final series of trials were undertaken before the final lift took place.

PFR reactor dismantling project manager Rob Hibbert explained: �This was a complex and technical challenge for the team and a significant achievement to carry out the remote operations safely in a hazardous environment. During this project, readings were recorded from the depths of the reactor in excess of 1000Sv/hr, which is valuable data for carrying out the remainder of the reactor decommissioning plans.

�We need to fully understand the different types and quantities of remotely handled waste components inside the reactor, which will be sized and packaged at PFR. This helps us prepare the scope for the new infrastructure for the remainder of the reactor dismantling and waste removal as we decommission the reactor internals prior to reactor hall demolition.�

The final reactor component extraction and characterisation will be completed during 2014.

 

Related Businesses

 

Related Articles

NDA calls for engagement on refreshed decommissioning strategyThumbnail for article : NDA calls for engagement on refreshed decommissioning strategy
The NDA has published its strategy for consultation, setting out the roadmap to decommission the UK's earliest nuclear sites safely, securely and sustainably.   Today, the Nuclear Decommissioning Authority (NDA) has published its revised strategy for public consultation, setting out a clear roadmap for one of the UK's most complex long-term environmental challenges.  
Dounreay helps Caithness retrieve its past
A Pictish stone believed to date back 1,700 years has been retrieved and preserved for future generations with financial help from Dounreay's operators.   Dounreay isn't the only site in Caithness where relics of the past are being retrieved and made safe for the future.  
Dounreay awarded Gold status for fourth year by ECITBThumbnail for article : Dounreay awarded Gold status for fourth year by ECITB
NRS Dounreay has been awarded Gold status for skills and training for the fourth consecutive year by the Engineering Construction Industry Training Board.   The engineering construction industry values its members, who design, construct, maintain, renew and dismantle the UK's strategically important industrial infrastructure.  
New reports examine impact of nuclear decommissioning in ScotlandThumbnail for article : New reports examine impact of nuclear decommissioning in Scotland
Research offers a positive outlook for communities impacted by the decommissioning process.   A new study has revealed that Scotland's £25 billion nuclear decommissioning programme could deliver significant long-term economic and social benefits at both national and local levels over the next 90 years and beyond.  
Sellafield's 'locked vault’ gives up its nuclear secrets
One of the most challenging puzzles in the UK's nuclear clean-up programme is being solved.   Waste is now being routinely retrieved from one of the world's oldest nuclear waste stores for the first time in its history.  
Crane back in business - with a little help from Spot the robot dog at DounreayThumbnail for article : Crane back in business - with a little help from Spot the robot dog at Dounreay
Spot, the robot "dog," recently assisted colleagues in Dounreay's Fuel Cycle Area by reactivating a crucial building crane in a reprocessing plant.   The crane had been deactivated at the switchboard in 2023 due to concerns about the ageing asset.  
Dounreay to take on 23 new apprenticesThumbnail for article : Dounreay to take on 23 new apprentices
One of Britain's most complex environmental restoration projects is taking on 23 new apprentices.   The decommissioning of the former centre of fast reactor research and development at Dounreay is continuing to create long-term opportunities for young people.  
Nuclear Restoration Services Has Appointed Dave Wilson As Managing Director Of Its Dounreay DivisionThumbnail for article : Nuclear Restoration Services Has Appointed Dave Wilson As Managing Director Of Its Dounreay Division
He joins from AtkinsRealis, where he was market director and delivery lead for its nuclear decommissioning and waste services business, and officially takes up the post today (18 November 2024), He succeeds John Grierson who has served as interim MD since May.   NRS CEO Rob Fletcher said, "I am very pleased that Dave Wilson has agreed to join the team at Dounreay.  
NDA Supply Chain Award Winners 2024 Revealed
The Nuclear Decommissioning Authority group have announced five organisations as winners of this year's supply chain awards.   Morgan Sindall Infrastructure, The Decommissioning Delivery Partnership, PA Consulting, Antech and The Higher Activity Waste Thermal Treatment Tranche 1 Team are the big winners in this year's supply chain awards.  
UKAEA Monthly Newsletter Latest EditionThumbnail for article : UKAEA Monthly Newsletter Latest Edition
Find out what has been happening at UKAEA in our monthly newsletter.  Read about our recent activities and upcoming events.