Dounreay and Nuvia Ltd collaborate on new beach monitoring vehicles
8th December 2014
Dounreay's beach monitoring fleet has a new look with the addition of new vehicles - the Metrac H5 all-terrain vehicle (ATV).
The H5s are fitted with the same GroundhogTM Evolution monitoring equipment as the current ATVs, so this is a change of looks but not a change of function.
The current Hill Cat ATVs have been a familiar sight on beaches near Dounreay for more than a decade and the beach monitoring team are preparing for the inevitability of vehicle end-of-life.
In November, both Hill Cats and one of the Metrac H5 ATVs, performed the statutory monitoring of Strathy and Murkle beaches, as well as the monthly monitoring of Sandside beach and the Dounreay foreshore.
For two of those beaches, the presence of the specialised ATVs is a new sight. The beaches at Strathy and Murkle are now to be monitored twice a year (during May and November) to comply with the site's new Radioactive Substances Act Authorisation by the Scottish Environment Protection Agency.
Steve Innes, DSRL's project supervisor in the Environmental Closure and Demolition (ECD) department, responsible for the beach monitoring explains: "Nuvia, the Contracts department and ECD worked together over several months to procure and commission the Metrac for use at Dounreay, to provide sufficient resource to comply with the statutory monitoring requirements.
"These requirements are particularly demanding during November, when there is a large area to cover and the weather and daylight hours are against us.
"At the moment, it looks like the monitoring programme will be completed successfully."
Nuvia already use the Metrac to monitor beaches at Sellafield using another, similar, version of the GroundhogTM monitoring system and the vehicle was tested on Caithness beaches to assess its suitability.
The GroundhogTM Evolution beach monitoring equipment that is fitted on both models of ATVs continues to provide high quality detection capability here in Caithness and elsewhere in the world.
The Metrac H5 has many advantages over the older machines, not least because the driver has all-round vision and the vehicle has 4-wheel steering which results in less disturbance of the surface of the beach.
The Hill Cats will be retained in service to provide additional resource during peak monitoring periods.
As the beach monitoring programme is likely to continue for a number of years, until SEPA is confident that the monitoring campaign has served its purpose, the new ATVs will become a regular sight on the beaches at Sandside and to a lesser extent, Strathy and Murkle.
PHOTO
The new Metrac vehicle and right the old vehicle that was regularly out.
Related Businesses
Related Articles
He joins from AtkinsRealis, where he was market director and delivery lead for its nuclear decommissioning and waste services business, and officially takes up the post today (18 November 2024), He succeeds John Grierson who has served as interim MD since May. NRS CEO Rob Fletcher said, "I am very pleased that Dave Wilson has agreed to join the team at Dounreay.
The Nuclear Decommissioning Authority group have announced five organisations as winners of this year's supply chain awards. Morgan Sindall Infrastructure, The Decommissioning Delivery Partnership, PA Consulting, Antech and The Higher Activity Waste Thermal Treatment Tranche 1 Team are the big winners in this year's supply chain awards.
Find out what has been happening at UKAEA in our monthly newsletter. Read about our recent activities and upcoming events.
With a degree in electrical and electronic engineering and a keen interest in the nuclear sector, Anouschka knew Sellafield would be the best place for her to begin her career in the industry. That career has already seen her relocate from Sheffield to Cumbria and scooping the title of Sellafield Ltd Graduate of the Year.
More than 140 graduates have started at Sellafield Ltd. Over 140 graduates have just started their exciting careers with the company in a range of business and technical disciplines, supporting Sellafield Ltd in its mission to create a clean and safe environment for future generations.
Find out what has been happening at UKAEA in our monthly newsletter. Read about our recent activities and upcoming events.
The Nuclear Decommissioning Authority (NDA) group has on 26 September 2024 published its 2023 to 2024 socio-economic report detailing a record investment in projects across the UK. Over the last five years, the NDA group has invested £60 million in projects that enable permanent and sustainable change in its site communities, leveraging many millions more from partners.
Today, the ponds inside the Thermal Oxide Reprocessing Plant (or as we like to call it, Thorp) are used to store nuclear fuel that has been used in the UK's 7 operational nuclear reactors. Before taking on this new mission, Thorp reprocessed 9,000 tonnes of used nuclear fuel from around the world, generating an estimated £9 billion in revenue for the UK over 2 decades.
Over 100 graduates join the Nuclear Decommissioning Authority group today as applications open for 2025. As applications open for 2025, the Nuclear Decommissioning Authority (NDA) group also welcomed its largest ever cohort of graduates today, with more than 100 new recruits ready to support delivery of one of the world's most important environmental programmes.
In a world-first, a fully autonomous robot has been used to inspect the inside of a fusion energy facility. In a world-first, a fully autonomous robot has been used to inspect the inside of a fusion energy facility.