Subsea 7 are about to commence the launch of a pipeline bundle into Sinclair's Bay.
31st December 2020
Please be advised that Subsea 7 are about to commence the launch of a pipeline bundle into Sinclair's Bay. This operation will take between 24 - 36 hours and we require to open the Wester Bridge on the A99 to allow towheads to pass under and out to sea.
In line with this, the A99 will be closed for up to a maximum of 1 hour on two separate occasions on the 1st and/or 2nd of January however a diversionary route, if required, is available via Hastigrow and Lyth. The exact dates and times of closure will be determined by Subsea 7's operational requirements and, in particular, weather conditions.
Thank you for now and apologies for any inconvenience caused.
Related Businesses
Related Articles
10/1/2021
Willie Watt Of Subsea7 Retires
Published in the John O'Groat Journal today (10 January 2021) is the news that after a long career at Subsea7 Willie Watt Retires. Read the full story HERE.7/8/2020
Final Towhead Movement To Wester Site Today 7th August
Subsea 7 will be moving the final two towheads from Wick Harbour to Wester Site tomorrow, 7th of August; leaving Wick Harbour around 09:00 (dates and times are subject to having suitable weather and Police availability). This move should be similar to previous towhead moves, leaving Wick Harbour and proceeding directly to Wester Site.29/5/2020
Subsea 7 Announces Cost Reduction Measures - 3000 Jobs To Go Worldwide
Subsea 7 issued further details of the cost reduction programme, following initial guidance provided on 30 April 2020. It is envisaged that the overall reduction in headcount would be approximately 3,000 from the global workforce of 12,000, by the end of the second quarter 2021.10/5/2020
Wester Bridge Opening/road Closure
Subsea7 are about to commence the launch of a pipeline bundle into Sinclair's Bay. This operation will take between 24 - 36 hours and will require Subsea 7 to open the Wester Bridge to allow towheads to pass under and out to sea.10/3/2020
Towheads Travelling Through Wick To Subsea 7 Wester Site - 17 March 2020
Subsea 7 will be moving 2 towheads for the Buzzard Project from Wick Harbour to Wester Site in the coming days. The first towhead move is much the same as a normal towhead move and it is planned to leave Wick Harbour on Friday 13th March at around 09:30 and proceed directly to Wester Site - see sketch below.10/3/2020
Towheads Travelling Through Wick To Subsea 7 Wester Site - 16 March 2020
Subsea 7 will be moving 2 towheads for the Buzzard Project from Wick Harbour to Wester Site in the coming days. The first towhead move is much the same as a normal towhead move and it is planned to leave Wick Harbour on Friday 13th March at around 09:30 and proceed directly to Wester Site - see sketch below.10/3/2020
Towheads Travelling Through Wick To Subsea 7 Wester Site - 13 March 2020
Subsea 7 will be moving 2 towheads for the Buzzard Project from Wick Harbour to Wester Site in the coming days. The first towhead move is much the same as a normal towhead move and it is planned to leave Wick Harbour on Friday 13th March at around 09:30 and proceed directly to Wester Site - see sketch below.1/3/2020
Wester Bridge Opening/Road Closure
Please be advised that we are about to commence the launch of a pipeline bundle into Sinclair's Bay. This operation will take between 24 - 36 hours and will require Subsea 7 to open the Wester Bridge to allow towheads to pass under and out to sea.2/12/2019
Towheads/large Structures Travelling Through Wick
To whom it may concern: Subsea 7 will be moving three towheads for the Equinor Snorre Project from Wick Harbour to Wester Site from Monday 2nd December. It is planned that the towheads will travel along the route through town (as in the photograph below) over three days (one per day) and we hope to complete the operation by Wednesday the 4th of December.1/4/2019