Caithness Map :: Links to Site Map Great value Unlimited Broadband from an award winning provider SAT 12TH JUL 2025    10:07:04 AM BST
This site uses cookies, by continuing to use this site you accept the terms of our privacy policy
Back To Top
Caithness.Org Quick Links
Home
Construction
Leisure
Manufacturing
Misc.
Primary
Professional
Public
Retail
Tourism
Transport
Site Map
 
 
 
 
 
 
 
 
 
 
 
 
 

Feed 2.0 Loading...

SAE Renewables MeyGen Phase 1 tidal array continues to break records

28th September 2024

SAE Renewables Limited (LON:SAE) has announced its unaudited interim results for the six months ended 30 June 2024.

Key Highlights

· SAE received £7.0 million from the land sale contract with EL (Uskmouth) Ltd.

· SAE acquired 100% ownership of the AW1 120MW/240MWh Battery Energy Storage System ("BESS") project

· SAE submitted a planning application for Section 36 consent for the 300MW/1.2GWh "Mey BESS" project in the North of Scotland.

· The consolidated cash position of the Group as at 30 June 2024 was £7.7 million (as at 30 June 2023: £2.3 million)

· The Group reported revenues of £12.1 million for the six months ended 30 June 2024 compared to revenues of £12.4m for the same period in 2023.

Read the full report HERE