Subsea 7 Gains £63 Million Contract
4th February 2012
Seabed-to-surface engineering firm Subsea 7 announced its £63m contract from BP Exploration Operating Company today, safeguarding 100 jobs at the company.
The deal is part of the second phase of the Clair Ridge Project, 75km west of Shetland, which is undergoing £4.5bn investment from BP.
The Clair Ridge development will comprise of two new bridge-linked platforms north-east of Clair Phase 1, with an estimated access to 640m barrels of recoverable oil, and see up to 120 thousand barrels per day at peak, extending the life of the field to 2050.
Subsea 7's contract includes the project management, engineering, procurement, fabrication and installation of a 6km 22" oil export pipeline and a 14km 6" gas export pipeline connected to the new production facilities and existing Clair Phase 1 export systems.
The pipeline systems will allow product to be transported from Clair Ridge to Sullom Voe Terminal (SVT) in the Shetland Islands via a dedicated gas export pipeline spur tied into the Clair Phase 1 pipeline. The associated gas will be tied into West of Shetland Pipeline System via the gas export pipeline.
The 22" oil export pipeline bundle will be fabricated at Subsea 7's Wester site facility in Wick, Scotland and will be installed using the Controlled Depth Tow Method. The 6" gas export pipeline will be fabricated at Subsea 7's Vigra spoolbase, Norway, which engineers continuous pipe laying. The deal has scope to includes tie-ins of integrated subsea towhead structures, field testing and pre-commissioning activities.
Engineering and project management will commence from Subsea 7's Aberdeen office in early 2012, with offshore operations due to commence in 2013.
Subsea 7's UK vice president Steph McNeill was pleased to be awarded a major pipeline project by BP, highlighting the number of jobs it has safeguarded.
"Fabrication will take place at our Wick facility in Scotland, which has a proven track record of successful bundle design, fabrication and installation, securing work for approximately 100 people," said Ms McNeill, "we look forward to helping bring on-stream the Clair Ridge Project in an efficient, timely and safe manner."
Scottish Secretary Michael Moore said: "This major contract underlines the confidence of the oil and gas sector and world-leading engineering firms with bases in Scotland."
Related Businesses
Related Articles
Published in the John O'Groat Journal today (10 January 2021) is the news that after a long career at Subsea7 Willie Watt Retires. Read the full story HERE.
Please be advised that Subsea 7 are about to commence the launch of a pipeline bundle into Sinclair's Bay. This operation will take between 24 - 36 hours and we require to open the Wester Bridge on the A99 to allow towheads to pass under and out to sea.
Subsea 7 will be moving the final two towheads from Wick Harbour to Wester Site tomorrow, 7th of August; leaving Wick Harbour around 09:00 (dates and times are subject to having suitable weather and Police availability). This move should be similar to previous towhead moves, leaving Wick Harbour and proceeding directly to Wester Site.
Subsea 7 issued further details of the cost reduction programme, following initial guidance provided on 30 April 2020. It is envisaged that the overall reduction in headcount would be approximately 3,000 from the global workforce of 12,000, by the end of the second quarter 2021.
Subsea7 are about to commence the launch of a pipeline bundle into Sinclair's Bay. This operation will take between 24 - 36 hours and will require Subsea 7 to open the Wester Bridge to allow towheads to pass under and out to sea.
Subsea 7 will be moving 2 towheads for the Buzzard Project from Wick Harbour to Wester Site in the coming days. The first towhead move is much the same as a normal towhead move and it is planned to leave Wick Harbour on Friday 13th March at around 09:30 and proceed directly to Wester Site - see sketch below.
Subsea 7 will be moving 2 towheads for the Buzzard Project from Wick Harbour to Wester Site in the coming days. The first towhead move is much the same as a normal towhead move and it is planned to leave Wick Harbour on Friday 13th March at around 09:30 and proceed directly to Wester Site - see sketch below.
Subsea 7 will be moving 2 towheads for the Buzzard Project from Wick Harbour to Wester Site in the coming days. The first towhead move is much the same as a normal towhead move and it is planned to leave Wick Harbour on Friday 13th March at around 09:30 and proceed directly to Wester Site - see sketch below.
Please be advised that we are about to commence the launch of a pipeline bundle into Sinclair's Bay. This operation will take between 24 - 36 hours and will require Subsea 7 to open the Wester Bridge to allow towheads to pass under and out to sea.
To whom it may concern: Subsea 7 will be moving three towheads for the Equinor Snorre Project from Wick Harbour to Wester Site from Monday 2nd December. It is planned that the towheads will travel along the route through town (as in the photograph below) over three days (one per day) and we hope to complete the operation by Wednesday the 4th of December.