Highland Council winter road condition reports for Thursday, 5 December 2013
5th December 2013
The Highland Council�s snow clearing / gritting route policies and area maps are online for 2013/14 at www.highland.gov.uk/gritting.
Road condition and gritting treatment reports by The Highland Council�s, Transport, Environmental and Community Services for Thursday 5 December 2013 are as follows:
Caithness, South Sutherland and East Ross
U2126 Oykel Bailley Bridge Road closed due to flooding. All roads in the Tain and Easter Ross, and Central Sutherland affected by fallen trees but currently passable. Roads throughout the area affected by fallen debris but passable with care. Posted: 05/12/2013 09:09
All routes treated ahead of snow showers forecast, gale force winds and heavy rain branches on roads. Posted: 05/12/2013 08:17
Caithness & North Sutherland
A mixture of heavy rain and wintery showers, high winds, treating all routes ahead of anticipated snow. Posted: 05/12/2013 09:05
Lochaber
The U1598 Glen Achulish road has re-opened. Posted: 05/12/2013 16:19
The U1313 Bellsgrove-Polloch has now been reopened. Posted: 05/12/2013 14:27
Wide spread storm damage, trees down and standing water on roads. Crews dealing with fallen trees as required. Pre-treatment for forecast snow delayed until 11am due to residual effects of storm. Posted: 05/12/2013 10:28
Skye and Lochalsh
All routes being treated. No issues Posted: 05/12/2013 12:39
Badenoch and Strathspey
Road report update Heavy snow showers gritting ongoing, Curlys Lane Newtonmore closed due to blown tree. Posted: 05/12/2013 12:19
North Sutherland
Minor by-pass road at Tongue closed due to erosion and subsequent debris. Posted: 05/12/2013 11:50
Nairn
Several trees and branches were down over roads and all cleared. Posted: 05/12/2013 11:24
Wet and windy, some trees and branches on road, being cleared. Posted: 05/12/2013 08:39
Badenoch and Strathspey
High gust of wind Trees and branches down on some roads this morning. All routes cleared and open. Rain turning to snow gritting ongoing all routes. Posted: 05/12/2013 11:11
Inverness
B9006/B9090 closed between Clephanton Crossroads and A96 due to accident car/tree. B852 Dores Foyers closed due to fallen trees. A number of side roads in Kiltarlity, Beauly, Foyers Gorthleck Areas blocked with fallen trees. Grant Street Inverness was closed due to dangerous building. B862 Inverness to Beauly Rd - Was blocked due to fallen trees now passable with care. Posted: 05/12/2013 11:04
The information provided is a summary of reports from operational staff and is intended to give a general indication of typical conditions in each area at a point in time. It is not intended to imply that any individual route is entirely snow and ice free and drivers must be aware that conditions can change rapidly and make their own assessment of conditions for travelling.
Related Businesses
Related Articles
Highland Councillors have considered £756m investment across Highland communities over the next 5 years when they discussed an updated report on the consolidated Highland Investment Plan (HIP) at a meeting of The Highland Council on Thursday 15 May 2025. Convener of the Council, Cllr Bill Lobban said: "The consolidated programme which was presented to Members is part of a longer-term strategy for the Highland Investment Plan which creates a potential £2.1bn of capital investment over a twenty-year period.
Highland Council's Environmental Health team have identified raised levels of naturally occurring bivalve shellfish biotoxins following routine monitoring at Loch Portree. Eating bivalve shellfish such as cockles, mussels, oysters or razor fish from the area of Loch Portree may pose a health risk arising from the consumption of these biotoxins.
After a successful three-week trial of thermal technology in 2024, Highland Council has appointed Thermal Road Repairs for a two-year patching repair contract worth a seven-figure sum. This will provide an additional resource for repairing surface defects such as potholes, cracking and deteriorating surfacing joints.
The scale of transformational opportunity facing the Highlands and Islands economy has been quantified for the first time in a new report. The study reports 251 planned development projects in the economic pipeline of what it refers to as regional transformational opportunities (RTOs).
Maggie Cunningham and Dr. Jim McCormick have been appointed as co-chairs of a new multi-partnership Poverty and Equality Commission Board.
The Highland Council has published its Renewable Energy Mapping Tool. This tool will enable those with an interest in understanding the location and type of renewable energy projects within Highland to discover not only what already exists on the ground but also the stage that any projects may be at within the planning process.
The Highlands and Islands Regional Economic Partnership (HIREP)'s Regional Economic Strategy addresses the challenges affecting the region's businesses and communities. A partnership of public, private and academic organisations in the Highlands and Islands has unveiled its ten-year strategy to deliver sustainable economic growth across the region.
BT has launched a consultation on the removal of 110 public payphones in Highland which they state are no longer needed. Details of the payphones being considered for closure are set out in the list at this link.
An ambitious plan to improve transport, roads and buildings, as well as a greater shift to using digital to deliver services, has the potential to transform the Highland Council's services over the next 20 years. Delivering its capital programme could prove challenging.
Anyone wishing to gain Council endorsement of a significant building project in Highland should consider responding to the current Call for Development Sites. Every 10 years, each council in Scotland must, for its area, prepare a planning document called a local development plan.